Initial problem
Humidity Response was instructed to support a new-build construction site comprising 16 apartments on the Hastings coastline as the project moved into colder and wetter seasonal conditions.
Excess construction moisture and changing weather conditions can affect internal materials and programme timescales, so the requirement was to establish controlled drying conditions quickly and support the continuing build programme.
Solution
The team deployed the Rapid Drying System, completed the site setup and had the system operational within hours. The objective was to protect internal structures from excess moisture and help the project remain on schedule.
Technical approach
The deployment formed part of a construction-drying strategy rather than an emergency flood response. Specialist drying equipment was used to influence the internal environment and support moisture reduction within the developing building fabric.